Hale Engineering & Consultancy Services
  • Consulting
  • Services
  • Training
  • News & Insights
  • Contact us
Select Page
Case Study: PLC Modernisation of Industrial Incinerator Control System

Case Study: PLC Modernisation of Industrial Incinerator Control System

by Hale Engineering | May 28, 2026 | Case Studies

This case study looks at the successful delivery of a major control system upgrade for an industrial incinerator, where long-term reliability, safety and operational resilience were critical. The goal was to replace a 30-year-old Mitsubishi PLC system with a fully...
Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

by Hale Engineering | May 12, 2026 | Case Studies

This case study looks at the successful delivery of a critical electrical upgrade at a high-capacity industrial incineration plant, where reliability, safety and operational continuity are essential. The goal was to modernise the plant’s ageing electrical...
Repairing and upgrading Kawasaki Bin Washing Robot Issues

Repairing and upgrading Kawasaki Bin Washing Robot Issues

by Hale Engineering | Jun 10, 2024 | Case Studies

Our client recently reported operational difficulties with their Kawasaki bin washing robot. The robot exhibited issues with both bin handling and lid opening, specifically failing to securely grasp and maneuver the bins, and experiencing malfunctions with the bin lid...
Waste incinerator plant boiler panel upgrade, implementation and saftey check

Waste incinerator plant boiler panel upgrade, implementation and saftey check

by Hale Engineering | May 14, 2024 | Case Studies

A new customer approached Hale Engineering, given the companies recognised expertise in waste incineration, to upgrade an old boiler panel and make PLC and SCADA modifications to improve the safety and efficiency of the plant. The project involved the replacement of...
Enhancing Industrial Operations through Control Room Redesign

Enhancing Industrial Operations through Control Room Redesign

by Hale Engineering | Apr 11, 2024 | Case Studies

In efforts to increase efficiency an industrial processing client reached out to us for a comprehensive plant control system upgrade. As part of this project, Hale Engineering was tasked with conceptualising a new control room design to optimise efficiency and...
« Older Entries

Recent Posts

  • Case Study: PLC Modernisation of Industrial Incinerator Control System
  • Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility
  • Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility
  • Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement
  • The 5 most common mistakes in control system upgrades (and how to avoid them)

Recent Comments

No comments to show.
Copyright © 2026 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle