by Hale Engineering | May 28, 2026 | Case Studies
This case study looks at the successful delivery of a major control system upgrade for an industrial incinerator, where long-term reliability, safety and operational resilience were critical. The goal was to replace a 30-year-old Mitsubishi PLC system with a fully...
by Hale Engineering | May 12, 2026 | Case Studies
This case study looks at the successful delivery of a critical electrical upgrade at a high-capacity industrial incineration plant, where reliability, safety and operational continuity are essential. The goal was to modernise the plant’s ageing electrical...
by Hale Engineering | Jun 10, 2024 | Case Studies
Our client recently reported operational difficulties with their Kawasaki bin washing robot. The robot exhibited issues with both bin handling and lid opening, specifically failing to securely grasp and maneuver the bins, and experiencing malfunctions with the bin lid...
by Hale Engineering | May 14, 2024 | Case Studies
A new customer approached Hale Engineering, given the companies recognised expertise in waste incineration, to upgrade an old boiler panel and make PLC and SCADA modifications to improve the safety and efficiency of the plant. The project involved the replacement of...
by Hale Engineering | Apr 11, 2024 | Case Studies
In efforts to increase efficiency an industrial processing client reached out to us for a comprehensive plant control system upgrade. As part of this project, Hale Engineering was tasked with conceptualising a new control room design to optimise efficiency and...