by Hale Engineering | May 28, 2026 | Case Studies
This case study looks at the successful delivery of a major control system upgrade for an industrial incinerator, where long-term reliability, safety and operational resilience were critical. The goal was to replace a 30-year-old Mitsubishi PLC system with a fully...
by Hale Engineering | May 28, 2026 | Case Studies
This incinerator control system upgrade case study explains how control system risk can build over time across incineration and industrial process sites. It does not always appear suddenly; it often develops through repeated drive faults, ageing protection devices,...
by Hale Engineering | May 12, 2026 | Case Studies
This case study looks at the successful delivery of a critical electrical upgrade at a high-capacity industrial incineration plant, where reliability, safety and operational continuity are essential. The goal was to modernise the plant’s ageing electrical...
by Hale Eng | Mar 5, 2026 | Case Studies
A client approached our engineering team with a critical safety concern involving the monitoring and control of negative pressure within their ventilation system. The requirement was highly specific: the system needed to detect negative pressure values reaching –70 Pa...
by Hale Eng | Mar 24, 2025 | Case Studies
Hale Engineering has been approached to replace an ageing system in an industrial facility with a modern Motor Control Centre (MCC) and enclosure. The existing system was outdated and inefficient, leading to increased maintenance costs, operational challenges, and...
by Hale Eng | Mar 5, 2025 | Case Studies
Hale Engineering has undertaken a new project where we are using laser scanning technology to design a replacement control system for an industrial plant. By creating a highly accurate 3D model of the client’s site, we ensure precision in the integration of the new...