by Hale Engineering | Jul 16, 2026 | Case Studies
Incineration plant control system upgrade projects are often driven by ageing equipment, repeated faults, poor circuit selectivity and limited visibility across critical plant systems. A single failed sensor, damaged cable or shared fuse can cause unexpected...
by Hale Engineering | Jun 30, 2026 | Case Studies
This case study shows how Hale Engineering Consultancy & Services Ltd supported a client with a critical industrial automation fault affecting a legacy Siemens 505 PLC, WinCC Explorer SCADA, flow metering system and weighing instrumentation. The work focused on...
by Hale Engineering | Jun 30, 2026 | Case Studies
Removing redundant equipment from a live incineration plant can be technically demanding, especially when redundant equipment remains connected to operational systems. In older industrial plants, legacy cabling, historical modifications and equipment changes can...
by Hale Engineering | May 28, 2026 | Case Studies
This incinerator control system upgrade case study explains how control system risk can build over time across incineration and industrial process sites. It does not always appear suddenly; it often develops through repeated drive faults, ageing protection devices,...