Hale Engineering & Consultancy Services
  • Consulting
  • Services
  • Training
    • Allen Bradley PLC
    • Siemens PLC
  • News & Insights
  • Contact us
Select Page
ANNOUNCEMENT: Hale Engineering and Arlio partner on IT and OT security for UK manufacturers

ANNOUNCEMENT: Hale Engineering and Arlio partner on IT and OT security for UK manufacturers

by Hale Engineering | Nov 12, 2026 | News

Hale Engineering and Arlio are joining forces to help UK manufacturers build safer, more secure and resilient industrial operations. This article is for operations directors, engineering managers and plant managers at UK manufacturing and industrial sites, and for the...
Case Study: Remote I/O Panel FAT Procedure Defines Workshop Tests

Case Study: Remote I/O Panel FAT Procedure Defines Workshop Tests

by Hale Engineering | Nov 10, 2026 | Case Studies

An operator sees a temperature on screen. A remote input/output (I/O) panel sees an electrical signal. Hale Engineering Consultancy & Services Ltd reviewed the panel drawings and prepared a factory acceptance test (FAT) procedure that defined how engineers would...
Case Study: Retrofitting a Medical Waste Incinerator with Weishaupt Modulating Burners and 4–20 mA PID Control

Case Study: Retrofitting a Medical Waste Incinerator with Weishaupt Modulating Burners and 4–20 mA PID Control

by Hale Engineering | Oct 30, 2026 | Case Studies

Hale Engineering Consultancy & Services Ltd completed a medical waste incinerator burner upgrade in the UK, integrating five Weishaupt gas burners with an existing Allen-Bradley CompactLogix programmable logic controller (PLC). Its 4–20 mA modulation logic and...
Case Study: Thermocouple Cable Replacement Restores Stable Temperature Signals

Case Study: Thermocouple Cable Replacement Restores Stable Temperature Signals

by Hale Engineering | Oct 20, 2026 | Case Studies

Hale Engineering Consultancy & Services Ltd completed a thermocouple cable replacement on four temperature loops serving a rotary kiln and waste heat recovery boiler at a clinical waste incineration facility. Engineers traced unstable signals to degraded cabling...
Case Study: Pre-Tipper PLC Upgrade Improves Fault Diagnosis and Reduces Downtime

Case Study: Pre-Tipper PLC Upgrade Improves Fault Diagnosis and Reduces Downtime

by Hale Engineering | Sep 11, 2026 | Case Studies

Hale Engineering completed a pre-tipper PLC upgrade after ageing controls and missing plant connectivity prolonged fault recovery. Engineers traced undocumented wiring, built a new CompactLogix control panel and integrated the machine with SCADA. The upgrade improved...
« Older Entries

Recent Posts

  • ANNOUNCEMENT: Hale Engineering and Arlio partner on IT and OT security for UK manufacturers
  • Case Study: Remote I/O Panel FAT Procedure Defines Workshop Tests
  • OT cyber security: lessons from the supermarket freezer attacks
  • Case Study: Retrofitting a Medical Waste Incinerator with Weishaupt Modulating Burners and 4–20 mA PID Control
  • The IT/OT gap in manufacturing: who owns the link between the office and the plant?

Recent Comments

No comments to show.
Copyright © 2026 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle