Hale Engineering & Consultancy Services
  • Consulting
  • Services
  • Training
    • Allen Bradley PLC
    • Siemens PLC
  • News & Insights
  • Contact us
Select Page
Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant

Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant

by Hale Engineering | Jun 30, 2026 | Case Studies

Removing redundant equipment from a live incineration plant can be technically demanding, especially when redundant equipment remains connected to operational systems. In older industrial plants, legacy cabling, historical modifications and equipment changes can...
Case Study: PLC Modernisation of Industrial Incinerator Control System

Case Study: PLC Modernisation of Industrial Incinerator Control System

by Hale Engineering | May 28, 2026 | Case Studies

This case study looks at the successful delivery of a major control system upgrade for an industrial incinerator, where long-term reliability, safety and operational resilience were critical. The goal was to replace a 30-year-old Mitsubishi PLC system with a fully...
Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility

Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility

by Hale Engineering | May 28, 2026 | Case Studies

This incinerator control system upgrade case study explains how control system risk can build over time across incineration and industrial process sites. It does not always appear suddenly; it often develops through repeated drive faults, ageing protection devices,...
Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

by Hale Engineering | May 12, 2026 | Case Studies

This case study looks at the successful delivery of a critical electrical upgrade at a high-capacity industrial incineration plant, where reliability, safety and operational continuity are essential. The goal was to modernise the plant’s ageing electrical...
Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement

Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement

by Larysa Hale | Mar 5, 2026 | Case Studies

A client approached our engineering team with a critical safety concern involving the monitoring and control of negative pressure within their ventilation system. The requirement was highly specific: the system needed to detect negative pressure values reaching –70 Pa...
Upgrading an ageing industrial system with a modern Motor Control Centre (MCC)

Upgrading an ageing industrial system with a modern Motor Control Centre (MCC)

by Larysa Hale | Mar 24, 2025 | Case Studies

Hale Engineering has been approached to replace an ageing system in an industrial facility with a modern Motor Control Centre (MCC) and enclosure. The existing system was outdated and inefficient, leading to increased maintenance costs, operational challenges, and...
« Older Entries
Next Entries »

Recent Posts

  • Automation training cell: building robotics and PLC skills away from the live line
  • Case Study: Thermocouple Cable Replacement Restores Stable Temperature Signals
  • Case Study: Pre-Tipper PLC Upgrade Improves Fault Diagnosis and Reduces Downtime
  • Case Study: Industrial OT Network Survey Improves Plant Network Visibility and Fault Finding
  • Case Study: Industrial PLC Modernisation for a Waste-to-Energy Plant From Total Shutdown to Reliable Operation

Recent Comments

No comments to show.
Copyright © 2026 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle