Repairing and upgrading Kawasaki Bin Washing Robot Issues

Repairing and upgrading Kawasaki Bin Washing Robot Issues

by Hale Engineering | Jun 10, 2024 | Case Studies

Our client recently reported operational difficulties with their Kawasaki bin washing robot. The robot exhibited issues with both bin handling and lid opening, specifically failing to securely grasp and maneuver the bins, and experiencing malfunctions with the bin lid...
Waste incinerator plant boiler panel upgrade, implementation and saftey check

Waste incinerator plant boiler panel upgrade, implementation and saftey check

by Hale Engineering | May 14, 2024 | Case Studies

A new customer approached Hale Engineering, given the companies recognised expertise in waste incineration, to upgrade an old boiler panel and make PLC and SCADA modifications to improve the safety and efficiency of the plant. The project involved the replacement of...
Enhancing Industrial Operations through Control Room Redesign

Enhancing Industrial Operations through Control Room Redesign

by Hale Engineering | Apr 11, 2024 | Case Studies

In efforts to increase efficiency an industrial processing client reached out to us for a comprehensive plant control system upgrade. As part of this project, Hale Engineering was tasked with conceptualising a new control room design to optimise efficiency and...
Revamping Robotic Bin Wash Line: A Case Study by Hale Engineering

Revamping Robotic Bin Wash Line: A Case Study by Hale Engineering

by Hale Engineering | Apr 11, 2024 | Case Studies

Design projects are not often conducted by the engineering consultant company. However, here at Hale we change the norm. Our most recent project was to assist our client to overhaul an existing robotic bin wash line and in this case study we will discuss how we did...
Lamination press renewal: Hale Engineering upgrades existing machinery to save costs on replacement

Lamination press renewal: Hale Engineering upgrades existing machinery to save costs on replacement

by Hale Engineering | Mar 5, 2024 | Case Studies

Hale Engineering specialises in various areas of industrial engineering. We are unique in the way we offer a variety of services, from consultation to design and installation. Recently, we undertook a project that not only showcased our wide range of skills but also...
Upgrading Siemens PLC In a Drum Filling System

Upgrading Siemens PLC In a Drum Filling System

by Hale Engineering | Feb 16, 2024 | Case Studies

The Hale Engineering team recently undertook a significant upgrade for Moove Lubricants Ltd based in Kent, replacing an outdated Siemens PLC with the latest model in their drum system. The company needed the system to be upgraded as the existing PLC system was too old...
« Older Entries
Next Entries »

Recent Posts

  • Case Study: Industrial OT Network Survey Improves Plant Network Visibility and Fault Finding
  • Case Study: Industrial PLC Modernisation for a Waste-to-Energy Plant From Total Shutdown to Reliable Operation
  • Case Study: Legacy Siemens 505 PLC, WinCC SCADA and Industrial Instrumentation Fault Finding
  • Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant
  • Case Study: PLC Modernisation of Industrial Incinerator Control System