Engineering Solution for A Faulty Draught Sensor

Engineering Solution for A Faulty Draught Sensor

by Hale Engineering | Nov 30, 2023 | Case Studies

The Hale Engineering Team recently played a pivotal role in addressing a pressing issue for one of our clients. This involved a faulty draught sensor within an intricate incinerator system. This predicament became apparent as a noticeable discrepancy surfaced between...
Selective Non-Catalytic Reduction System Integration: Enhancing Control with Siemens PLC in Mitsubishi Environment

Selective Non-Catalytic Reduction System Integration: Enhancing Control with Siemens PLC in Mitsubishi Environment

by Hale Engineering | Nov 24, 2023 | Case Studies

Often in engineering, the need to upgrade and integrate with legacy control systems is a common challenge. This case study delves into a scenario where our client’s existing Mitsubishi PLC lacked the capability to communicate with an advanced SNCR system. These...
Three-Phase Power Socket Re-Location For Transformer

Three-Phase Power Socket Re-Location For Transformer

by Hale Engineering | Nov 14, 2023 | Case Studies

Hale Engineering’s newest project involved the relocation of a three-phase power socket to a new location 40 meters away from its current spot. This relocation was necessary so to provide power to a new 28VDC transformer. The case study includes the Hale...
Reviving and Upgrading a Discontinued Bag House Controller

Reviving and Upgrading a Discontinued Bag House Controller

by Hale Engineering | Nov 6, 2023 | Case Studies

Within industrial automation and engineering, innovation is a constant necessity. Engineers must adapt, enhance, and sometimes even resurrect aging systems to maintain efficiency and competitiveness. This case study is Hale Engineering’s task in reviving a...
Revolutionising Industrial Carbon Supply For Incinerator

Revolutionising Industrial Carbon Supply For Incinerator

by Hale Engineering | Oct 30, 2023 | Case Studies

In the ever-evolving landscape of industrial engineering, innovation is a driving force behind enhanced efficiency and productivity. The Hale Engineering team’s recent project is a demonstration commitment to progress. With a keen focus on carbon dosing, they...
Controller Upgrade In The Ashford Project Baghouse: 2 Days

Controller Upgrade In The Ashford Project Baghouse: 2 Days

by Hale Engineering | Oct 12, 2023 | Case Studies

The Hale Engineering team recently undertook a project which involved replacing and upgrading an old circuit with an Allen Bradley PLC for a Baghouse controller. The project involved the installation of a new power supply, MCB (Miniature Circuit Breaker), solid-state...
« Older Entries
Next Entries »

Recent Posts

  • Case Study: Legacy Siemens 505 PLC, WinCC SCADA and Industrial Instrumentation Fault Finding
  • Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant
  • Case Study: PLC Modernisation of Industrial Incinerator Control System
  • Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility
  • Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility