Hale Engineering & Consultancy Services
  • Consulting
  • Services
  • Training
  • News & Insights
  • Contact us
Select Page
Revolutionising Industrial Carbon Supply For Incinerator

Revolutionising Industrial Carbon Supply For Incinerator

by Hale Engineering | Oct 30, 2023 | Case Studies

In the ever-evolving landscape of industrial engineering, innovation is a driving force behind enhanced efficiency and productivity. The Hale Engineering team’s recent project is a demonstration commitment to progress. With a keen focus on carbon dosing, they...
Controller Upgrade In The Ashford Project Baghouse: 2 Days

Controller Upgrade In The Ashford Project Baghouse: 2 Days

by Hale Engineering | Oct 12, 2023 | Case Studies

The Hale Engineering team recently undertook a project which involved replacing and upgrading an old circuit with an Allen Bradley PLC for a Baghouse controller. The project involved the installation of a new power supply, MCB (Miniature Circuit Breaker), solid-state...
Industrial Efficiency: Expert ID Fan Motor Replacement and Repairs

Industrial Efficiency: Expert ID Fan Motor Replacement and Repairs

by Hale Engineering | Oct 6, 2023 | Case Studies

When it comes to critical components like ID (Induced Draft) Fan motors, ensuring seamless replacement and addressing associated issues is crucial to avoid costly downtime. In this article, we delve into a recent success story involving Hale Engineering, where their...
Upgrading Temperature Probes for Enhanced Efficiency Case Study

Upgrading Temperature Probes for Enhanced Efficiency Case Study

by Hale Engineering | Sep 27, 2023 | Case Studies

Maintaining the right temperature is often the key to ensuring the smooth operation of various manufacturing systems. When a manufacturing plant recently faced temperature-related challenges, they called Hale Engineering to investigate and resolve the issue. What they...
Why Is Maintenance Important? Overheating Frequency Drive Unit- Reactive Call At 10pm

Why Is Maintenance Important? Overheating Frequency Drive Unit- Reactive Call At 10pm

by Hale Engineering | Sep 19, 2023 | Case Studies

Challenges can arise at any moment in engineering and it is important to have an effective and smooth response to ensure successful operations. This was highlighted recently when we received a reactive call at 10 pm concerning a clients hardware overheating issue. The...
« Older Entries
Next Entries »

Recent Posts

  • Case Study: PLC Modernisation of Industrial Incinerator Control System
  • Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility
  • Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility
  • Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement
  • The 5 most common mistakes in control system upgrades (and how to avoid them)

Recent Comments

No comments to show.
Copyright © 2026 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle