Our Case Studies
Explore our success stories and discover how Hale Engineering has transformed industrial landscapes through cutting-edge automation and control solutions.
Upgrading Siemens PLC In a Drum Filling System
The Hale Engineering team recently undertook a significant upgrade for Moove Lubricants Ltd based in Kent, replacing an outdated Siemens PLC with the latest model in their drum system. The company needed the system to be upgraded as the existing PLC system was too old...
SNCR System Engineering Installation
Introducing our first case study of 2024! This is an ongoing project which we were called to. This visit involved the introduction of SNCR tech which is one of Hale Engineering's many specialties. The team recently introduced Selective Noncatalytic Reduction (SNCR)...
Relocating Condensate Extraction Instrumentation and Siemens Software Updates
In response to the evolving needs of our clients, the Hale Engineering team recently undertook a project involving the relocation of Condensate Extraction System collection tanks within a customer's plant. The driving force behind this move was the integration of a...
Engineering Solution for A Faulty Draught Sensor
The Hale Engineering Team recently played a pivotal role in addressing a pressing issue for one of our clients. This involved a faulty draught sensor within an intricate incinerator system. This predicament became apparent as a noticeable discrepancy surfaced between...
Selective Non-Catalytic Reduction System Integration: Enhancing Control with Siemens PLC in Mitsubishi Environment
Often in engineering, the need to upgrade and integrate with legacy control systems is a common challenge. This case study delves into a scenario where our client's existing Mitsubishi PLC lacked the capability to communicate with an advanced SNCR system. These...
Three-Phase Power Socket Re-Location For Transformer
Hale Engineering's newest project involved the relocation of a three-phase power socket to a new location 40 meters away from its current spot. This relocation was necessary so to provide power to a new 28VDC transformer. The case study includes the Hale Engineering...
Reviving and Upgrading a Discontinued Bag House Controller
Within industrial automation and engineering, innovation is a constant necessity. Engineers must adapt, enhance, and sometimes even resurrect aging systems to maintain efficiency and competitiveness. This case study is Hale Engineering's task in reviving a...
Revolutionising Industrial Carbon Supply For Incinerator
In the ever-evolving landscape of industrial engineering, innovation is a driving force behind enhanced efficiency and productivity. The Hale Engineering team's recent project is a demonstration commitment to progress. With a keen focus on carbon dosing, they were...
Controller Upgrade In The Ashford Project Baghouse: 2 Days
The Hale Engineering team recently undertook a project which involved replacing and upgrading an old circuit with an Allen Bradley PLC for a Baghouse controller. The project involved the installation of a new power supply, MCB (Miniature Circuit Breaker), solid-state...