Case Study: Industrial OT Network Survey Improves Plant Network Visibility and Fault Finding

Case Study: Industrial OT Network Survey Improves Plant Network Visibility and Fault Finding

by Hale Engineering | Aug 14, 2026 | Case Studies

Hale Engineering completed an industrial OT network survey after frequent shutdowns were linked to an unlabelled, undocumented network. Engineers traced every network cable, identified connected devices and IP addresses, and produced a clear network diagram and...
Case Study: Industrial PLC Modernisation for a Waste-to-Energy Plant From Total Shutdown to Reliable Operation

Case Study: Industrial PLC Modernisation for a Waste-to-Energy Plant From Total Shutdown to Reliable Operation

by Hale Engineering | Jul 16, 2026 | Case Studies

Incineration plant control system upgrade projects are often driven by ageing equipment, repeated faults, poor circuit selectivity and limited visibility across critical plant systems. A single failed sensor, damaged cable or shared fuse can cause unexpected...
Case Study: Legacy Siemens 505 PLC, WinCC SCADA and Industrial Instrumentation Fault Finding

Case Study: Legacy Siemens 505 PLC, WinCC SCADA and Industrial Instrumentation Fault Finding

by Hale Engineering | Jun 30, 2026 | Case Studies

This case study shows how Hale Engineering Consultancy & Services Ltd supported a client with a critical industrial automation fault affecting a legacy Siemens 505 PLC, WinCC Explorer SCADA, flow metering system and weighing instrumentation. The work focused on...
Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant

Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant

by Hale Engineering | Jun 30, 2026 | Case Studies

Removing redundant equipment from a live incineration plant can be technically demanding, especially when redundant equipment remains connected to operational systems. In older industrial plants, legacy cabling, historical modifications and equipment changes can...
Case Study: PLC Modernisation of Industrial Incinerator Control System

Case Study: PLC Modernisation of Industrial Incinerator Control System

by Hale Engineering | May 28, 2026 | Case Studies

This case study looks at the successful delivery of a major control system upgrade for an industrial incinerator, where long-term reliability, safety and operational resilience were critical. The goal was to replace a 30-year-old Mitsubishi PLC system with a fully...
Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility

Case Study: Incinerator Control System Upgrade: Improving Reliability, Motor Protection and Plant Visibility

by Hale Engineering | May 28, 2026 | Case Studies

This incinerator control system upgrade case study explains how control system risk can build over time across incineration and industrial process sites. It does not always appear suddenly; it often develops through repeated drive faults, ageing protection devices,...
Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

Case Study: Full MCC Replacement & Plant Rewiring at Industrial Incineration Facility

by Hale Engineering | May 12, 2026 | Case Studies

This case study looks at the successful delivery of a critical electrical upgrade at a high-capacity industrial incineration plant, where reliability, safety and operational continuity are essential. The goal was to modernise the plant’s ageing electrical...
Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement

Case Study: Delivering a Smart Safety Solution for a Complex Negative Pressure Requirement

by Hale Eng | Mar 5, 2026 | Case Studies

A client approached our engineering team with a critical safety concern involving the monitoring and control of negative pressure within their ventilation system. The requirement was highly specific: the system needed to detect negative pressure values reaching –70 Pa...
The 5 most common mistakes in control system upgrades (and how to avoid them)

The 5 most common mistakes in control system upgrades (and how to avoid them)

by Hale Eng | Dec 2, 2025 | Industrial Automation Insights

Modern plants depend on automation that works flawlessly — but when it’s time to upgrade, many organisations underestimate just how complex, high-risk, and interdependent their control systems really are. A PLC or SCADA upgrade isn’t just swapping hardware. It affects...
PLC Health Checks and Upgrades: How to Know When It’s Time to Repair or Replace

PLC Health Checks and Upgrades: How to Know When It’s Time to Repair or Replace

by Hale Eng | Nov 4, 2025 | Industrial Automation Insights

In industrial operations, a well-maintained PLC system is the difference between smooth production and unexpected downtime. But as systems age, even the most reliable controllers can develop issues that impact safety, efficiency, and performance. Yet for many small...
« Older Entries

Recent Posts

  • Case Study: Industrial OT Network Survey Improves Plant Network Visibility and Fault Finding
  • Case Study: Industrial PLC Modernisation for a Waste-to-Energy Plant From Total Shutdown to Reliable Operation
  • Case Study: Legacy Siemens 505 PLC, WinCC SCADA and Industrial Instrumentation Fault Finding
  • Case Study: Removing Redundant Equipment Safely from a Live Incineration Plant
  • Case Study: PLC Modernisation of Industrial Incinerator Control System

Recent Comments

No comments to show.
Copyright © 2026 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle