Revolutionising Industrial Carbon Supply For Incinerator

Revolutionising Industrial Carbon Supply For Incinerator

by Tilly Little | Oct 30, 2023 | Case Studies

In the ever-evolving landscape of industrial engineering, innovation is a driving force behind enhanced efficiency and productivity. The Hale Engineering team’s recent project is a demonstration commitment to progress. With a keen focus on carbon dosing, they...
Controller Upgrade In The Ashford Project Baghouse: 2 Days

Controller Upgrade In The Ashford Project Baghouse: 2 Days

by Tilly Little | Oct 12, 2023 | Case Studies

The Hale Engineering team recently undertook a project which involved replacing and upgrading an old circuit with an Allen Bradley PLC for a Baghouse controller. The project involved the installation of a new power supply, MCB (Miniature Circuit Breaker), solid-state...
Industrial Efficiency: Expert ID Fan Motor Replacement and Repairs

Industrial Efficiency: Expert ID Fan Motor Replacement and Repairs

by Tilly Little | Oct 6, 2023 | Case Studies

When it comes to critical components like ID (Induced Draft) Fan motors, ensuring seamless replacement and addressing associated issues is crucial to avoid costly downtime. In this article, we delve into a recent success story involving Hale Engineering, where their...
Upgrading Temperature Probes for Enhanced Efficiency Case Study

Upgrading Temperature Probes for Enhanced Efficiency Case Study

by Tilly Little | Sep 27, 2023 | Case Studies

Maintaining the right temperature is often the key to ensuring the smooth operation of various manufacturing systems. When a manufacturing plant recently faced temperature-related challenges, they called Hale Engineering to investigate and resolve the issue. What they...
Why Is Maintenance Important? Overheating Frequency Drive Unit- Reactive Call At 10pm

Why Is Maintenance Important? Overheating Frequency Drive Unit- Reactive Call At 10pm

by Tilly Little | Sep 19, 2023 | Case Studies

Challenges can arise at any moment in engineering and it is important to have an effective and smooth response to ensure successful operations. This was highlighted recently when we received a reactive call at 10 pm concerning a clients hardware overheating issue. The...
Upgrading Industrial Equipment for Enhanced Efficiency and Safety

Upgrading Industrial Equipment for Enhanced Efficiency and Safety

by Tilly Little | Sep 18, 2023 | Case Studies

Reliability and efficiency of machinery in the electrical engineering is important. During this article we will delve into 2 major enhancements to industrial equipment Hale Engineering undertook. One being the replacement of an ageing ABB drive and the other,...
Roof Fan Control Circuit Upgrade: Precision Planning and Panel Construction

Roof Fan Control Circuit Upgrade: Precision Planning and Panel Construction

by Tilly Little | Sep 1, 2023 | Case Studies

This case study highlights the upgrade of our Roof Fan Control circuits, where we detail the essential steps, from initial planning to panel construction. Planning for Success: The case study began with a site visit by our engineer, gathering crucial data to shape the...
Enhancing Sprinkler Valve System Efficiency: Our Custom Control Panel Project for Water Tank Refill

Enhancing Sprinkler Valve System Efficiency: Our Custom Control Panel Project for Water Tank Refill

by Tilly Little | Sep 1, 2023 | Case Studies

Our recent project involved the creation of a new control panel for a Sprinkler Valve system which oversees the water tank refill process. Our objective was clear: design a control panel capable of autonomously closing the refill supply valve when the water tank...
Siemens MAG 5000 Meter: Transformative Implementation

Siemens MAG 5000 Meter: Transformative Implementation

by Tilly Little | Sep 1, 2023 | Case Studies

Here we have a short case study by Hale Engineering. Sean commissioned a Siemens MAG 5000 flow meter, designed to monitor the m³/h steam flow from a boiler. He configured the 4-20 mA output to an Allan Bradley controller, enabling real-time data transmission and...
Fireshield Transformation – Before and After Project Success

Fireshield Transformation – Before and After Project Success

by Tilly Little | Sep 1, 2023 | Case Studies

Our mission was to transform this fire pump into booster pumps for a metal shredding facility. This was so that the fire pumps would bolster fire safety. We wanted to ensure a reliable water supply for an intelligent fire detection system, enabling rapid response to...
« Older Entries
Next Entries »

Recent Posts

  • Hale Engineering Welcomes Rockwell Automation’s Launch of PointMax™ I/O System
  • Upgrading an ageing industrial system with a modern Motor Control Centre (MCC)
  • Hale Engineering’s Expertise in Laser Scanning for Control System Design
  • Health and Safety Responsibilities for Grid-Scale Battery Energy Storage Systems
  • Revolutionising Fluid Management with Automated Tank Filling

Recent Comments

No comments to show.
Copyright © 2025 Hale Engineering Consultancy & Services LTD | Powered by

Expert Circle